Energy · Grid Operations · Transmission Systems
VoltVerse
Zero-Risk Practice for High-Voltage Switching
What it does
- VR training for Transmission System Operators (TSOs) on 110 kV substation switching & earthing procedures
- Guides trainees through the full sequence: confirm work order, identify equipment, execute switching, activate earthing, verify no-voltage state
- Repeatable 20-25 minutes sessions let operators practice safely before ever working on live equipment
Why it matters
Grid operators have traditionally trained on live equipment, where a single switching error can cause blackouts or serious injury. VoltVerse lets Transmission System Operators rehearse the full switching and earthing sequence in VR — as many times as it takes — before they ever touch a real substation.
Custom VR / AR software
Zero-Risk Practice for High-Voltage Switching.
- Built forEnergy, Grid Operations, Transmission Systems
- DeliveryCustom VR / AR software, multi-platform
- ApproachDesigned around your facility, team and risks
Try it · browser demo
Can you isolate feeder F2 safely?
A simplified 110 kV bay. Follow the procedure, tap each element in order. The full VR version runs 20–25 minute sessions on real procedures.
Step 1/6 Errors 0 Time 0.0s
- 1 Confirm the work order
- 2 Identify the equipment
- 3 Open the circuit breaker
- 4 Open the disconnector
- 5 Verify the no-voltage state
- 6 Activate earthing
Tap the work order on the left.