Energy · Grid Operations · Transmission Systems

VoltVerse

Zero-Risk Practice for High-Voltage Switching

What it does

  • VR training for Transmission System Operators (TSOs) on 110 kV substation switching & earthing procedures
  • Guides trainees through the full sequence: confirm work order, identify equipment, execute switching, activate earthing, verify no-voltage state
  • Repeatable 20-25 minutes sessions let operators practice safely before ever working on live equipment

Why it matters

Grid operators have traditionally trained on live equipment, where a single switching error can cause blackouts or serious injury. VoltVerse lets Transmission System Operators rehearse the full switching and earthing sequence in VR — as many times as it takes — before they ever touch a real substation.

Request a demo
← Back to catalogue

Custom VR / AR software

Zero-Risk Practice for High-Voltage Switching.

  • Built forEnergy, Grid Operations, Transmission Systems
  • DeliveryCustom VR / AR software, multi-platform
  • ApproachDesigned around your facility, team and risks

Try it · browser demo

Can you isolate feeder F2 safely?

A simplified 110 kV bay. Follow the procedure, tap each element in order. The full VR version runs 20–25 minute sessions on real procedures.

Step 1/6 Errors 0 Time 0.0s
110 kV CB DS F1 CB DS ES F2 CB F3 WORK ORDER #24-117 Isolate & earth feeder F2 TESTER — kV
  1. 1 Confirm the work order
  2. 2 Identify the equipment
  3. 3 Open the circuit breaker
  4. 4 Open the disconnector
  5. 5 Verify the no-voltage state
  6. 6 Activate earthing

Tap the work order on the left.